Södermalm Roast Notes

Standard V60 Recipe
Dose15g Coffee
Water250g (93°C)
GrindMedium-Coarse
Time2:30 min
00:00 — Bloom (50g)

Pour 50g of water. Swirl gently to ensure complete saturation. Allow a 45-second bloom to degas fresh roasts thoroughly.

00:45 — First Pour (+100g)

Pour in concentric circles up to 150g total weight. Maintain a steady flow rate to encourage agitation without clogging the filter.

01:30 — Final Pour (+100g)

Pour continuously until reaching 250g. Give one final, gentle swirl to level the bed for an even drawdown.